Aktobe region, Khromtau district, near Akzhar settlement
Working design of Beta Wind wind power plant with a capacity of 100 MW (13 wind turbines of 7.7 MW each) without estimate documentation.
January 9, 2026 - positive opinion no. 01-0005/26.
2026 г.

Kyzylorda oblast, Shiyeli district
Full working design of power grid facilities of SES with installed capacity of 60 MW, including 110/20 kV substation, 110 kV overhead line and all necessary engineering solutions.
January 30, 2026 - positive opinion no. 02-0010/26.
2026 г.

Zhetysu oblast, Alakol district
AlmatyProjectEnergoStroy performed design works and received a positive opinion on the working project "Expansion of RP in Alakol district of Zhetysu province".
The facility provides a visible circuit break on a 110 kV overhead line breakaway for safe maintenance.
May 19, 2025 - positive opinion no. PS-0027/25.
2025 г.

Aktobe region, Khromtau district, near Akzhar settlement
A working draft has been developed "Expansion of 220 kV switchgear of 500 kV Ulke substation" to deliver the capacity of wind power plants of Argest LLP (100 MW) and Beta Wind LLP (100 MW) to the energy system of Kazakhstan.
May 26, 2025 - positive opinion no. PS-0028/25.
2025 г.

Aktobe region, Khromtau district, near Akzhar settlement
A full range of design works on two single-circuit overhead lines-220 kV to supply two wind farms with a total of 200 MW. Length of the routes: L1 - 28.87 km, L2 - 28.78 km.
June 2, 2025 - positive opinion no. 01-0189/25.
2025 г.

Aktobe region, Khromtau district, near Akzhar settlement
Working Draft Substation 35/220 kV "VES Argest" (without cost estimates). It includes: two 220/35 kV transformers of 125 MVA each, 220 kV switchgear-220 kV (scheme 220-4H), 35 kV switchgear (22 cells) and all necessary infrastructure for 200 MW wind farm.
July 30, 2025 - positive opinion no. 01-0293/25.
2025 г.

Aktobe region, Khromtau district, near Akzhar settlement
Integrated design "Construction of 100 MW Argest LLP and 100 MW Beta Wind LLP WPPs" ("VES Argest"). Includes generation, internal networks, engineering systems and the entire infrastructure of the largest wind farm in the region.
August 4, 2025 - positive opinion no. 04-0180/25.
2025 г.

г. Aktobe
Working Draft "Construction of 110 kV power supply networks of Moiseyev water pipeline in Aktobe city". Provides reliable supply to the strategic urban water pipeline. Alignments with KEGOC, KTZ, KazAutoZhol and others.
November 11, 2025 - positive opinion no. 04-0262/25.
2025 г.

г. Astana
As part of the project for the supply and implementation of 110 kV high-voltage equipment, design documentation for relay protection and automation systems was developed. In particular, the company's specialists carried out the design of relay protection cabinets and SCADA panels, taking into account the requirements for integration into the overall substation architecture.
2024 г.

г. Almaty
As part of the 110 kV high-voltage equipment implementation project, design documentation was developed for the assembly of SCADA panels and relay protection cabinets.
2024 г.

г. Karaganda
Development of working project "Modernization of telecommunication equipment and software of data transmission channels from KAZ Minerals Bozshakol LLP to RDC of Northern MES".
2024 г.

г. Astana
Supply, installation and commissioning of a 110 kV substation for a 50 MW power plant. The equipment package includes a 63 MVA power transformer, 110 kV switchgear equipment, 35 kV cells, RPA cabinets, SCADA, telecommunications, AC and DC systems. The project is part of the first large hybrid power complex in Kazakhstan (120 MW HPP, 70 MW WPP, 50 MW SES).
2023 г.

г. Astana
Author supervision services for the construction of the project "Reconstruction and construction of 110 kV transmission line in Astana (with replacement of transformers at PS "Zhuldyz" and reconstruction of 110 kV cable line from PS "Vostochnaya"). Adjustment"
2023 г.

г. Astana
Author supervision services for the construction of the project "Reconstruction and construction of 110 kV transmission line in Astana (with replacement of transformers at PS "Zhuldyz" and reconstruction of 110 kV cable line from PS "Vostochnaya"). Adjustment"
2023 г.
г. Astana
Author's supervision services for construction of facilities
2023 г.

г. Astana
Development of design and estimate documentation "Construction of a closed 110/20 kV substation "Kabanbay Batyr" with 110 kV transmission line for power supply of objects of prospective development in the southern part of Astana city"
2022 г.
г. Astana
Development of design and estimate documentation "Construction of closed 110/20 kV substation "Ansaghan" with 110 kV transmission line for power supply of objects of prospective development west of Turan Ave. in Astana city.
2022 г.

г. Astana
Development of design and estimate documentation "Construction of closed PS-110/20/10 kV "Batigai" for power supply of objects of perspective development "Batigai" in Astana".
2022 г.
г. Kulsary
Development of design documentation for the Project on assembly of SCADA complexes and relay protection cabinets for Kulsary and Pravoberezhnaya substations. The works included design, assembly and preparation of equipment for implementation at power infrastructure facilities.
2022 г.

г. Aktobe
Development of the design and construction documentation for reconstruction of 110 kV overhead line "Zarechny - 41 passageway": reconstruction of 110 kV double-circuit power line with replacement of wire, lightning rod and supports - from the GMZ switchyard to the Zarechnaya substation, reconstruction of 110 kV double-circuit power line with replacement of wire and lightning rod from the Zarechnaya substation to the Akzhar substation.
2021 г.
Kyzylorda oblast.
Development of design and estimate documentation for the project "Reconstruction of the substation-220/35/10 kV "Shieli" in Shieli settlement of Kyzylorda region" with replacement of electrical equipment: power transformers T1 and T2, equipment of 220 kV switchgear, 35 kV switchgear, 10 kV switchgear, 35 kV arc-extinguishing reactors; modernization of RPA, ASCME and communication system; construction of a new building of the control room; outdoor lighting of the substation territory.
2021 г.


г. Astana
Reconstruction of the 110/10 kV Arman substation.
Reconstruction of 110/10 kV PNF substation
2021 г.


г. Astana
Design and survey works "Reconstruction and construction of 110 kV transmission line in Astana city (with replacement of transformers at PS "Zhuldyz" and reconstruction of 110 kV cable line from PS "Vostochnaya"). Adjustment" for connection to power supply of new objects in the area of "Mynzhyldyk" alley.
2020 г.
с. Koshy, Akmola region, Akmola obl.
Author's supervision on the project "Improvement and construction of engineering networks to 45 apartment house in Kosshy village (Pos.1) of Tselinograd district of Akmola region (Improvement)".
2020 г.

г. Astana
Adjustment "Reconstruction of substation 110/10 kV "Tsentralnaya" in Astana" within the framework of the Development Strategy of JSC "Astana - Regional Electric Grid Company" for 2021-2030.
2020 г.



Zhambyl oblast, Shu city.
Adjustment of the project "100 MW solar power plant in Shu city of Zhambyl oblast. Phase 3"
Author's supervision "Construction of power grid facilities of power output of the solar station "Shu" with capacity of 100 MW in the area of Shu city, Zhambyl region": Solar Panel Park - 1st stage, Power Delivery Station - 2nd stage.
2019 г.


г. Stepnogorsk, Akmola region
The project "Reconstruction of water treatment facilities Sopka-305" on the place of the old filtering station, built in the 70s of the last century, provides for the construction of a new building with the installation of modern filtering and pumping stations, arrangement of power supply networks and maintenance of water tanks.
2019 г.

г. Astana
Development of feasibility study "Utilization of groundwater deposits located near Nur-Sultan city as a reserve source of water supply in case of emergency situations (1st stage of construction)". A reserve source of water supply is envisaged for the city in case of emergency, including complete emptying of the reservoir or unsuitability of water consumption for drinking purposes. Nurinskoye groundwater deposit located near the city with a water reserve of 48.0 thousand cubic meters per day is considered as a source.
2019 г.



г. Temirtau
Adaptation of design documentation for installation of 110 kV power transformer of TDN-63000/110 UHL type within the framework of the project "Reconstruction of the ONRS GPP".
2018 г.


п. Jalagash
Development of a design and construction project for "30 MW solar power plant in Jalagash village of Jalagash district of Kyzylorda region" and a working project "Connection of 30 MW solar power plant in Jalagash district of Kyzylorda region to 220 kV overhead line GPP-1 Kyzylorda (L2019).
December 2018.


Tselinograd district, a. Akmola
Project "Construction of an administrative complex for the staff of the rural district akim's office in Akmol village of Tselinograd district of Akmola region"
December 2018.
г. Astana
Sewer collector construction project with microtunnel under the railroad crossing (CHPP-3)
October 2017.



г. Astana
10/0.4 kV TP reconstruction project for 2018 (12pcs)
November 2017.


Akmola region, Kabanbai Batyr settlement
Construction project of a 100 MW solar power plant located near Kabanbai Batyr village, Tselinograd district, Akmola region
December 2017.



г. Temirtau
Project for reconstruction of GNRS GPP for power supply of the ladle furnace unit No. 3 of KCC JSC ArcelorMittal Temirtau JSC
2017-2018.



г. Astana
Zhana Zhol 110/10 kV substation reconstruction project with a capacity of 2x80 MVA
February 2016.
г. Astana
Electricity supply project of the trade and logistics center "Keң Mart" in Astana city
February 2016.
г. Astana
Project for reconstruction of the Gorodskaya substation with a capacity of 2x40 MVA
July 2016.
г. Astana
Project of power supply networks of "Shopping and Entertainment Center, on the territory of the International Specialized Exhibition EXPO-2017"
October 2016.



г. Astana
Construction project of a closed 110/20 kV substation "Airport-Novaya with 110 kV transmission line rewires" with a capacity of 2x63 MVA
January 2015.
г. Astana
Project of external power supply networks (KL-10 kV) and electric lighting (0.4 kV) of the construction of the object "Specialized International Exhibition "EXPO2017″ in Astana".
November 2015.


г. Astana
Project of reconstruction of substation 110/10 kV Astana with capacity 2x63 MVA
August 2014.
г. Astana
Kazbek 110/20 kV substation construction project with capacity 2x40 MVA and 110 kV line in Astana, north of Zheleznodorozhny residential area.
September 2014.


г. Almaty
Project "Electricity supply of the new communal market Alai in Astana city"
September 2014.
Almaty region, Espe st.
Project for construction of 220 kV traction substation at Espe station
September 2014.
г. Astana
Project of reconstruction of autonomous heat supply of social facilities to centralized heating system (Transfer of social facilities to centralized heat supply).
May 2013.



г. Astana
Project of reconstruction of PS 110/10 kV "Nasosnaya" in Astana" with capacity 2x25 MVA
April 2013.


г. Almaty
Development project of electric networks of Karasay district of Almaty region. Construction of 110/10kV substation with 110kV overhead line
December 2013.
г. Astana
Project of removal of utility networks from the LRT construction zone under the project "New transportation system of Astana city (high-speed light-rail transportation system - LRT)"
December 2013.



North Kazakhstan region
Project of construction of repair and maintenance base with administrative and household building, branch of Joint Stock Company Zhana-Esil power supply distance at Novoishimskaya station
February 2012.
Akmola, Almaty, Karaganda oblasts
Traction substation modernization project:
May 2012.
г. Almaty
Talgar 110/35/10kV substation #58I "Talgar" reconstruction project with capacity 2x40 MVA
July 2012.
г. Almaty
Project of construction of cable line KL-110 kV of PS "KazSU" (new) from PS "Ermensai"
December 2012.



г. Aktau
Feasibility study for the project "Construction of a 110 kV cable transmission line and two 110/10 kV substations as part of the construction of the external infrastructure of the Caspian Energy Hub"
January 2011.
Mangystau region
Project of rearrangement and removal of 0,4; 10; 35; 110; 220 kV power lines" on the object: "Adjustment of the design and construction documentation for reconstruction of the section of Atyrau-Aktau republican highway, km 632,3-719.
April 2011
г. Almaty
Project for reconstruction of 110/6 kV substation No. 86 "Bush No. 29" with a capacity of 2x16 MVA
May 2011.
г. Astana
Project for construction and reconstruction of engineering networks and roads in Astana city
November 2011.
г. Astana
Development of design and construction plans for small-channel RRLs
January 2010.
г. Ekibastuz
FOCL project on Ekibastuzskaya 1150 - Northern DRC transmission line
September 2010.
Turkestan region, Saryagash
Reconstruction project of the health complex "Saryagash Sanatorium": Internal engineering networks. External engineering networks. Structural part of the health center
October 2010.



г. Astana
Construction project of power supply facilities in Astana (Closed substation 110/10 kV "Koktem-2" 2x63MVA)
March 2009.
Mangystau region, Aktau city
Construction project of 110/6 kV Priozernaya substation with capacity 2x16 MVA
April 2009.
Mangystau oblast, Uzen city
Project for reconstruction of 110 kV switchgear and relay protection devices at Uzen substation
July 2009.



г. Astana
Project of construction of a closed type substation 110/10 kV "Chubary" with capacity 2x63 MVA
September 2009.
г. Kyzylorda
District Center Energy System Development Project" of Kyzylorda oblast
December 2009.
г. Astana
Project of reconstruction of 110/10 kV Zhuldyz substation with capacity 2x40 MVA
April 2009.



Akmola region with. Koyandy
Construction of power transmission lines and power supply facilities to housing construction sites in Koyandy village of Tselinograd district
January 2008.
г. Astana
Adjustment of the electrical engineering part of the project "Construction of a closed 110/10 kV substation "Eastern Industrial District" with a capacity of 2x63 MVA
January 2008.



г. Astana
Construction project of power supply facilities in Astana "Closed Substation 110/10 kV "Kirova-2" 2x40MVA
September 2008.
Akmola region
Development of feasibility study for the project of construction and reconstruction of power supply lines and power supply facilities of settlements (14 pcs)
December 2008.



Karaganda region n. Osakarovka
Project for reconstruction of 27.5 kV switchgear and construction of a control room at the substation of 220 kV Osakarovka substation
October 2007.



Akmola region Shchuchinsk city
Adjustment of the project of construction of substation 35/10kV "Ski base" with capacity 2x6300 KVA with 35 kV overhead lines at the Republican skiing base in Shchuchinsk.
December 2006.