AlmatyProjectEnergoStroy (APES) - a leading design company in Kazakhstan, founded in 2006 in Astana. We specialize in integrated design of energy and engineering infrastructure facilities, performing a full cycle of works on a turnkey basis.
The company successfully implements projects of any complexity and scale:
- Transformer substations with voltage 0.4-500 kV
- Overhead and cable transmission lines 0.4-500 kV
- External and internal power supply networks
- Heat supply, water supply and wastewater disposal systems
APES employs more than 30 highly qualified specialists with specialized education, valid certificates and extensive practical experience. The core of the team consists of leading engineers with professional experience from 15 to 45 years, which guarantees an expert level of task fulfillment.
Over the years, the company has designed dozens of substations and thousands of kilometers of power lines throughout the Republic of Kazakhstan - from local facilities to large-scale infrastructure complexes of national importance.
AlmatyProjectEnergoStroy - is a reliable partner in the field of power engineering. We consistently ensure the highest quality of design solutions, strict compliance with the regulations of the Republic of Kazakhstan and international standards, accurate fulfillment of deadlines, individual approach to each customer and full responsibility for the result at all stages - from concept to commissioning.