Services

Design of substations and 0.4-500 kV transmission lines in Kazakhstan

Almaty Project Energostroy provides a full range of design services in the field of energy and engineering infrastructure. Since 2001, we have been implementing projects throughout Kazakhstan, relying on more than 25 years of experience energy specialists.

We perform:

  • design of substations with voltage from 0.4 to 500 kV;

  • of overhead and cable power lines;

  • power supply, heat supply, water supply and sewerage systems;

  • design of engineering networks and access roads to industrial and energy facilities.

Our approach is based on Professionalism, precision engineering and a thorough understanding of the industry. We utilize state-of-the-art technology, including BIM modelingThis allows to minimize errors, accurately coordinate all sections and ensure transparency at all stages.

The company carries out technical and author supervision Over the implementation of projects, controlling the compliance of construction solutions with the design documentation and regulatory requirements. This guarantees high quality end result and long-term reliability of the constructed facilities.

We don't just design - we create solutions that work. Steady. Reliable. Accurate.

Design in the areas of

Energy generation

Turnkey design of power plants and generating facilities in Kazakhstan.

Electricity supply

Design of substations, transmission lines and power supply of industrial facilities 0,4-500 kV.

Heat supply

Design of heat supply systems and heat networks for residential and industrial facilities.

Water supply and sewerage

Water supply and sewerage (WC) design for residential and industrial projects.

Engineering networks and infrastructure

Turnkey design of engineering networks and infrastructure in Kazakhstan.

How it works

01

Submitting an application

The client submits an application for design of the facility (substation, power line, power and water supply networks, etc.)

03

Designing

Engineers and planners start to develop the project. The work is supervised by the Chief Engineer.

05

Project delivery

The finished project is handed over to the customer exactly within the terms set out in the contract. All specified adjustments in the project are fulfilled.

02

Discussion

Our manager contacts the customer and negotiates all the points (consultation, discussion of nuances, payment, etc.).

04

Approval

The finished project is checked by the Chief Engineer and then approved by the Deputy General Manager.

Among our customers are such companies as: State Institution "Department of Energy" and State Institution "Department of Municipal Economy", State Institution "Department of Passenger Transportation and Roads", JSC "KEGOC", JSC "Astana-REC", JSC "AREC", State Institution "Construction Department of Tselinograd District", JSC "Kazakhstan Temir Zholy", JSC "Alatau Zharyk Company" and other companies.

Design work is carried out in close cooperation with leading domestic and foreign equipment manufacturers, such as JSC "Alageum Electric", JSC "KEMONT", JSC "Tamyr", Siemens, ABB, Schneider Electric, Alstom, PJSC "Zaporizhtransformer" and others.

Feedback from our customers

We know a lot of people here, for us the company is very responsible not only for business, but also for life. The project was done for us quickly and qualitatively, and all the nuances were taken into account.

Yamaur V.A. 04.05.2007 г.

Almatyproektenergostroy did our project of developing a design and construction documentation for small-channel overhead power lines as we had planned, they worked out everything to the last detail. Thank you!

Lapshin K.S. 17.01.2011 г.

Our cooperation with "Almaty Project Energy Construction" started with drafting a project for the construction of a cable power line. All works were agreed in advance...

Akhmetov E.M. 29.04.2014 г.
en_US

Project order

Please fill out the form below.

Order a project

Call order

Project order